PhotoKris
CGF II, Certified Grumble Framer Level 2
So we finally got around to moving our framing area to a better part of the store, and why not the two days before thanksgiving for doing it? The door mechanisms and the counter were built yesterday by our carpenter (who also happens to be my brother) and the corners were moved today by our LJ guy. Now it can be seen from outside the store and we've gotten several WOWs! There are going to be some signs and some more sample frames up, but here it is for now...
(for those who dont know, we are a photo lab/studio/ camera store that added framing 3 1/2 years ago when we moved to a bigger location. Its was tucked into a small area with a small counter. Its been doing well, so it gets its own area now -my shop is upstairs and is also our studio)

(for those who dont know, we are a photo lab/studio/ camera store that added framing 3 1/2 years ago when we moved to a bigger location. Its was tucked into a small area with a small counter. Its been doing well, so it gets its own area now -my shop is upstairs and is also our studio)