Putting in place.....
But all of the components took 3 years to prefabricate.
But the exterior is shelled with solar uptake skins so the
insulation factors are (China speaking) through the roof.
But this is the way of the future.
Last year there was a 280unit condo building built from
foundation to turn-key in 10 days in Moleninsk on the
Kamchafka pennisula in Russia... Sarah could see it. The units
were prefabbed in Idaho and Washington in just under
6 months and then shipped by sea barge down the Columbia
and across.
Two houses went up this last summer here in the neighborhood....
The crane showed up on Monday, the 8 units (1 per truck) on
Tuesday. Wednesday the tap and mud touch up..... paint on Thursday
and the move-in was on Saturday.